This client’s home flooded and they wanted to remodel their bathroom due to the flood. Previous to the redesign, the bathroom layout was stsndsrd and provided no storage, except under cabinet storage. The storage component really added much value to the clients, in addition to the entire redesign and Onyx slabs on the shower walls.
The largest challenge we faced on this project was time. At the time of the flood, many other homes were damaged and the supply chain began to become congested. This created a more lengthy process to obtain the materials which were needed to make the remodel the success it was!